Enter your square footage and get the range instantly
See the surface temperature table for every deck material.
Rounded to 50 dollars. The final number is fixed after we measure on site.
Installed price, material and labor included
| Surface | Per sq ft | What it covers |
|---|---|---|
| Pool deck and patio | $8 to 15 | Prep, primer, material, 2 year warranty |
| Walkway and driveway | $8 to 16 | Prep, primer, material, 2 year warranty |
| Playground safety | $8 to 13 | Prep, primer, material, 2 year warranty |
| Sports court | $8 to 15 | Prep, primer, material, 2 year warranty |
| Stone carpet | $8 to 13 | Prep, primer, material, 2 year warranty |
| Resurface and repair | $8 to 14 | Prep, primer, material, 2 year warranty |
Installed price per sq ft in South Florida
| Option | Per sq ft | What the price hides |
|---|---|---|
| B-Cool poured rubber | from $8 | No demolition, ready in 1 to 3 days, cool underfoot |
| Tear out and new pavers | $25 to 40 | Demolition, dumpsters and permits. Hot underfoot and weeds in the joints |
| Travertine | $18 to 30 | Cooler than pavers, still hard. Sealing every 2 to 3 years |
| Stamped concrete | $12 to 22 | Cracks follow the slab. Slick when wet unless sealed with grit |
| Acrylic spray deck | $2 to 6 | Peels in 1 or 2 Florida seasons. Redone every 3 years |
Poured rubber starts at 8 dollars per sq ft installed. Where your job lands comes from slab condition and color count. A slab that only needs cleaning and priming sits at the low end. A slab with spalling, old coating to grind off or standing water sits at the high end because prep is real work.
Prep is the variable, not the rubber. Grinding off a failed acrylic coating, filling cracks, correcting a low spot that ponds water and priming chalky concrete all add hours. We measure on site, then hand you 1 fixed number. If you already hold a comparable written quote, we beat it.
Yes. Small jobs carry the same mobilization, mixer setup and cure time as large ones, so anything under about 200 sq ft is priced as a minimum job rather than by the foot. We say the number at the estimate, not after.
No. The on site measurement is free and there is no deposit at the estimate. The deposit never exceeds 30% at signing and the balance is due only after you walk the finished surface.
Financing is available through a lender, and we can also split the payment in 2 at no extra cost with no lender, no credit check and no interest. We do not publish monthly figures because payment terms depend on the lender and the amount.
The rate per sq ft is the same across Broward and Miami-Dade. What changes is access and permitting. A gated community with an HOA approval step or a condo tower with a service elevator window adds schedule, not rate.